Hey Dominick I love you videos thanks for posting.  I am installing a shower pan and was wondering…do I install the tile board on the wall first then pour the shower pan mud bed? I already installed the pre pitch and liner on top but I am now at the stage of installing the top mortar bed and not sure which I should do first?

Thanks again,

in progress 0
Jose Sanchez 2 years 1 Answer 461 views

Answer ( 1 )

  1. You’re good where you are as of right now. But now I would install the tile board right on top of what you have and on top of the liner so the liner is up and under the tile board.